Re: EBS 12.2.0 NLS did not go through successfully
Posted by Max on
URL: http://erman-arslan-s-oracle-forum.114.s1.nabble.com/EBS-12-2-0-NLS-did-not-go-through-successfully-tp216p234.html
Hello Erman. So after applied EBS patch 12.2.4 I tried to execute this steps. prepare, apply, finalize, cutover, cleanup. But step fs_clone is failed.
$ adop -status
Enter the APPS password:
Current Patching Session ID: 3
Node Name Node Type Phase Status Started Finished Elapsed
--------------- --------------- --------------- --------------- ------------------------------ ------------------------------ ------------
db3h-dev master FS_CLONE FAILED 24-MAR-15 01:48:59 +03:00
PREPARE NOT APPLICABLE
APPLY NOT APPLICABLE
CUTOVER NOT APPLICABLE
CLEANUP NOT APPLICABLE
File System Synchronization Used in this Patching Cycle: Full
Note: fs_clone is required at db3h-dev node before starting the next online patching cycle.
For more information, run ADOP Status Report by using -detail option
Generating ADOP Status Report at location: /opt/vis11/fs_ne/EBSapps/log/status_20150324_140239/adzdshowstatus.out
Please wait...
Done...!
adop exiting with status = 0 (Success)